RICS Building Survey

Level 3
Full Building Survey

The most comprehensive survey available. Recommended for older properties, period homes, structural concerns, or properties with major alterations. Includes drone inspection where appropriate.

Level 3 structural inspectionLevel 3 detailed surveyLevel 3 building surveyLevel 3 property assessmentLevel 3 building assessment

0+

Inspections Completed

5.0 ★

Average Client Rating

907226

RICS Regulated Firm

Who Needs a Level 3 Survey?

The most detailed survey for properties that need expert assessment

Period Properties

Properties built before 1930, including Victorian, Edwardian, and Georgian homes with period features

Structural Concerns

Properties with visible defects, subsidence, movement, or structural alterations requiring investigation

Major Renovations

Properties with extensive alterations, extensions, or planning to undertake major works

Comprehensive Assessment Includes

The most thorough property inspection available

Detailed Structural Analysis

In-depth inspection of all internal elements, including windows, doors, floors, walls and roof structures, looking at both the interior and exterior of the property

Drone Inspection

High-resolution aerial photography of inaccessible areas, including roofs & chimney stacks

Defect Diagnosis

Detailed investigation and explanation of defects and their causes

Services Assessment

Comprehensive review of electrical, plumbing, heating, and drainage systems

Remedial Recommendations

Detailed assessment of each defect, recommended remedial approach, and urgency rating

Building Materials Analysis

Assessment of construction methods, materials, and age-related issues

Detailed Report

Comprehensive written report with photos, descriptions, and recommendations

Expert Consultation

Follow-up discussion to answer questions about the findings

Level 3 Survey Pricing

Transparent, fixed-price surveys with no hidden fees.

From £695
RICS Level 3 Building Survey
  • Includes drone inspection
  • Extensions & outbuildings included
  • Full photographic evidence
RICS StandardNo Hidden FeesReport Delivered 5–7 Days

RICS Level 3 Building Survey

A Level 3 survey provides a much more detailed and comprehensive assessment of the property and is typically recommended for:

  • Older properties, usually those built before 1930
  • Properties that appear to be in poor condition
  • Homes that have been extended, altered, or significantly modified
  • Buildings of non-standard construction and those that are listed

This survey involves a more in-depth inspection of the structure and fabric of the building. The report explains defects identified, their likely causes, the recommended remedial approach, and the implications if repairs are not carried out. Where possible, guidance is provided on the priority and likely timescale of repairs, helping buyers understand the practical implications of the findings.

For Level 3 surveys, NR Surveyors also utilise drone imagery where appropriate. This allows high-level elements such as roof coverings, chimney stacks, and other areas difficult to inspect from ground level to be viewed in greater detail. Drone imagery can help identify defects that may otherwise remain hidden and provides clear supporting evidence within the report.

As with our Level 2 surveys, the report is supported by extensive photographic evidence to clearly illustrate the findings.

Why Our Level 3 Survey?

Drone Technology

High-resolution aerial inspection of roofs and chimneys

RICS Qualified

All surveys conducted by RICS qualified surveyors

Detailed Report

Comprehensive written analysis with photos

5-7 Day Delivery

Fast turnaround without compromising quality

Compare Survey Levels

Level 2 Survey

From £450
  • Properties after 1930
  • Standard construction
  • Fair condition
MOST COMPREHENSIVE

Level 3 Survey

From £695
  • Properties before 1930
  • Structural concerns
  • Drone inspection included

Frequently Asked Questions

How long does a Level 3 survey take?

A Level 3 survey typically takes 4-6 hours depending on the property size and complexity. The comprehensive report is delivered within 5-7 working days.

When is drone inspection used?

Drone inspection is used where permitted and safe to capture high-resolution images of roofs, chimneys, and other inaccessible areas.

Is a Level 3 survey always required for pre-1930 properties?

We strongly recommend Level 3 for pre-1930 properties due to age-related defects common in period homes. The comprehensive assessment helps identify issues typical of Victorian and Edwardian construction.

What does the report include?

Our Level 3 reports provide a detailed assessment of each defect found, recommended remedial approach, and urgency rating, giving you everything you need to make an informed decision.

Book Your Comprehensive Level 3 Survey

Get the most detailed property assessment available from £695